Jump to content
This wiki has been closed since it has gone 30 days without activity. You may request that this wiki be reopened at Steward requests; it may also be reopened by a bureaucrat via Special:ManageWiki by unticking the "Closed" box.

Data: Difference between revisions

From Luter 345 Experiments
en>Jlabdaq
No edit summary
 
Brash99 (talk | contribs)
m 1 revision imported
 
(No difference)

Latest revision as of 19:58, 24 December 2024

Length and Mass Measurements

Measurements of the mass and length were made for the wire and the weight. As discussed in the Theory section, these measurements were used to computed the total length from the pivot point to the adjusted center of mass of the system.

Mass Length
Wire 11.28g 10.754m
Weight 769.30g 0.198m
Total 780.58 10.871m

Timing Data Collection

The photogate recorded timing information for each oscillation. Three runs of 268, 201, and 131 oscillations respectively were recorded. The raw data from each run can be seen in the attached Excel spreadsheets below.

The average and standard deviation for the period of oscillation was computed for each run independently, and for the entire data set, as seen in the table below.

T avg STDEV
Run1 6.6368s 0.002056
Run2 6.6362s 0.002627
Run3 6.6367s 0.00137
Total 6.6362 0.00216


The period of each oscillation was plotted and fitted as a function of time for each run. As expected, the period appears relatively constant between runs and drops off slowly over time as energy is dissipated from the system.

Left